Xinjiang Jiuzhou Hengchang Charging and Swapping Project

2025-08-01

300KM flexible energy replenishment! Free crossing of the Gobi Desert main line!

Project Location
Jiuzhou, Xinjiang
Scenario Type
Mainline logistics
Device Config
2 FX Mini type battery swapping stations and 8 320kW charging piles
Project Highlights

This project is two horizontal coal transportation logistics trunk lines within Xinjiang Autonomous Region, connecting about 30 power plants and 38 key coal consuming enterprises. The total length of the overall logistics trunk network is about 1500KM. The station is a transportation support for the Toksun Heishan coal mine in the Zhunnan coalfield, mainly serving 450 tractors on the 300KM coal transportation dedicated line in the mining area. The station consists of two FX Mini type battery swapping stations and eight 320kW charging piles. It adopts a pre installed design with a small footprint, greatly reducing civil engineering requirements and facilitating quick station and transition. The battery swapping time is short (3.5 minutes per time), and it can provide efficient 24-hour battery swapping services for 184 trains. It is highly favored by customers and has become the main source of energy replenishment for this main line.

Related Information