Charging, swapping and separation (matching with swapping station)
Four fold smooth upgrade
Quadruple high reliability design
Light storage charging and swapping integrated system
1. External charging station with good heat dissipation effect. Compared with traditional solutions, the temperature inside the station drops by more than 10 ℃
When there is an abnormal battery replacement, the vehicle can be directly charged through a charging station, which has a high efficiency of charging and swapping, ensuring operational efficiency
1. There are few operating vehicles in the initial stage, and a charging solution can be used; After the demand for transportation capacity increases, a battery swapping station will be installed, and equipment and platforms will be seamlessly upgraded
2. Charging piles support power upgrades: 320kW to 400kW, 400kW to 480kW
3. Charging pile supports efficiency upgrade: upgrading from 95% of ordinary modules to 97% of efficient modules
4. Charging pile (split type) supports terminal upgrade: dual gun terminals can be upgraded to liquid cooled terminals
1. The electrical compartment and module compartment are separated, and electrical components are not affected by harsh external environments
2. Fully filled adhesive module, reducing equipment failure rate by 5% and improving equipment lifespan
3. Ultrasonic welding+soldering technology reduces the heat generated by the charging gun and lowers the equipment failure rate
4. The sheet metal material has been upgraded from cold-rolled sheet to galvanized sheet, with a 30% increase in anti-corrosion performance
名称 |
1200kW PCS分体仓 |
尺寸 |
4156*2436*2894mm |
输出电流 |
250A |
输出电压 |
560~700Vdc |
枪数 |
8 |
防护等级 |
IP55 |
效率 |
≥95% |
噪音 |
≤65db |
400-077-7126
Headquarters:No.258 Xupan Road, Jiading District, Shanghai.
info@enneagon.com
Follow official account
Charging Mini Program