Cases
Focus on new energy, innovate charging and swapping

Ningxia Zhongwei Charging Station

2025-08-01

月均140万度电!从“电力卡脖”到“智慧满电”

Project Location
Ningxia Zhongwei
Scenario Type
干线
Device Config
梅梅(ˉ﹃ˉ): [图片] 梅梅(ˉ﹃ˉ): The first batch of 27 320kW piles (put into operation in November 2024) → 13 400kW piles in Phase II (put into operation in May 2023) → 30 400kW piles in Phase III (to be put into use after expansion), gradually easing the power pressure
Project Highlights

Jiuxing Energy, relying on its profound accumulation of energy replenishment technology, has designed a "phased expansion+intelligent pressure regulation" solution for the Zhongwei logistics hub. After the project is put into operation, the charging efficiency of the fleet has increased by 30%, with an average of over 150 vehicles served per day, completely bidding farewell to "charging anxiety". By flexibly adjusting the voltage at the device end, the operation of 18 piles can be guaranteed within the existing power grid capacity. Thanks to the high-quality design of Jiuxing charging stations, the equipment is reliable in quality and stable in operation. The actual utilization rate of charging stations is close to 50%, with an average daily output of 50000 kWh and serving over 150 heavy-duty trucks.

Related Information