Anjialing Open pit Mining Project

2025-08-01

Charging for 1 hour, battery life for 6 hours! The world's first 220 ton pure electric mining dump truck rewrites the economic account of mines!

Project Location
Shuozhou, Shanxi
Scenario Type
矿山
Device Config
Jiuxing Energy customizes a 1540kWh ultra large battery assembly, suitable for extreme working conditions in mines; Configure 4 sets of 1840KW high-power charging piles
Project Highlights

Facing the extreme environment of the mining area, Jiuxing provides battery packs and high-voltage systems with high protection levels to ensure dust and water resistance; Configure a battery intelligent temperature control system that supports low-temperature self heating and high-temperature liquid cooling to ensure stable operation at extreme temperatures; For the scenario of "large tonnage and large power", Jiuxing Energy customizes a 1540kWh ultra large battery assembly to adapt to extreme working conditions in mines; Configure 4 sets of 1840KW high-power charging piles, with 80% energy replenishment in 1.5 hours, suitable for heavy-duty mining truck needs. At present, in addition to the 220 ton pure electric mining dump truck, 16 sets of 120 ton pure electric mining dump trucks have been delivered to the site. Jiuxing Energy provides all battery frame assemblies, charging stations, high-voltage cabinets and other products, which have been recognized by customers for a long time from products to solutions.

Related Information